Brief:

Convert a single storey carport into a two storey house extension, incorporating kitchen, laundry, master bedroom, walk in wardrobe, ensuite. Silent switches were required in the upstairs area, the external wall containing the old switchboard and the old kitchen was to be demolished, wiring within the ceiling space to be tidied.

Solution:

We provided a flush mounted switchboard, combining metering and RCD protection. We used Legrand Excel Life electronic push button switches and dimmers to eliminate the clicking sound. The new switchboard was connected to the supply and a temporary connection was set up to keep the old kitchen working until the new one could be commisioned.

Outcome:

The project was completed on time and on budget